PSALM sets 05 April 2019 as new deadline for requirements of design contest

29 Mar 2019

The Power Sector Assets and Liabilities Management Corporation (PSALM) has set 05 April 2019 at 4:00 PM as the new deadline for the submission of expressions of interest and first stage requirements of the Architectural Conceptual Design Contest. The postponement of the original schedule, 22 March 2019, would allot more time to update the contest’s mechanics and to consider the preparation of the eligibility requirements from interested participants.

The design contest shall select the most energy-efficient conceptual design that could be used as basis for the master planning and redevelopment of the 5.1-hectare Diliman property which includes the current locations of National Power Corporation, National Transmission Corporation and National Grid Corporation of the Philippines. The entire property is centrally located in a long stretch of commercial establishments adjacent to Centris Walk and Vertis North in Quezon City.

Strategic Communications and Partnership Division
Tel. No. (632) 9029067